03/20/2023
Traffic Management Plan - M Block (GC 1)
Dear Valued Transporting Agents,
We would like to draw your kind attention on working procedure adopted at GC 1 (M block) - adjacent to CFS.
- The truck drivers to collect his document from M Block entrance through window
- Move into Ops area after barrier moves up
- Follow the route and stop the truck in the Truck Parking Number (TPN)
- Do not get down, Forklift operator will approach the driver for loading
- After loading, move straight to lashing area
- Do lashing (L1 to L6) and move straight to Exit gate
- Collect gate pass from Warehouse Controller through window
- Moves out after barrier goes up
In the above process, the driver to remain in his cabin and APM staff will assist if required.
Please follow the process and help us to maintain M Block away from transportation risks.
The Traffic Management Plan is attached herewith for reference:
Thanking you for your continued support.
Kind Regards,
APM Terminals Bahrain
Inicio de sesión en el panel de APM Terminals
Crear una cuenta de APMTerminals.com le permite:
- Suscríbase a nuestros boletines globales o terminales
- Configurar alertas de terminal (SMS o correo electrónico)
- Guarde los contenedores de importación en su lista de seguimiento de contenedores y configure las notificaciones por correo electrónico de contenedores
- Utilice nuestro sistema integrado de citas para camiones: terminales limitadas
- Solicite servicios adicionales en línea - terminales limitadas